Yuru Two-component polyurea waterproof coating

Home >  PRODUCT >  Polyurethane Polysulfide Sealant >  Yuru Two-component polyurea waterproof coating

All Categorys

Epoxy Floor
Waterproof Coating
Waterproof Membrane
Polyurethane Polysulfide Sealant
Injection Grout
Grout Pump
Technical Equipment

All Small Categorys

Epoxy Floor
Waterproof Coating
Waterproof Membrane
Polyurethane Polysulfide Sealant
Injection Grout
Grout Pump
Technical Equipment

Yuru Two-component polyurea waterproof coating

Quick Detail:

Two-component polyurea waterproof paint

Polyurea waterproof coating has many advantages and is widely used in construction, chemical, food, pharmaceutical and other industries. It has excellent effects in waterproofing, weather resistance, corrosion resistance, plasticity and scratch resistance.

  • Description
Inquiry

Is there a problem?
Please contact us to serve you!

Inquiry
Place of Origin: Nantong, Jiangsu, China
Brand Name: Yuru
Model Number: WP-2
Certification: CE, ISO
Minimum Order Quantity: 100 kilograms
Price: /
Packaging Details: 10kg/group, 20kg/group, 40kg/group Packaging specifications can be customized
Delivery Time: 7-15days
Payment Terms: T/T, L/C,paypal, western union
Supply Ability: 1000 tons per month

Description:

Two Components Polyurea Waterproof Material is a solvent-free, two-components, handbrush polyurea elastic material. The material is formed by on-site curing of semi prepolymers, amino terminated polyethers, delayed diamine chain extenders, and other raw materials. In an environment of -5 ℃, handbrush polyurea can still quickly cure, and the coating is dense and non foaming. This product has excellent mechanical properties, medium resistance, outdoor aging resistance, and excellent adhesion.

Characteristics of the Product

● Can cure at room temperature, surface dry within 12 hours, and dry within 24 hours.

● Excellent physical and chemical properties, with good adhesion to various substrates.

● Convenient construction, extremely high efficiency, can achieve the design thickness requirements (hundreds of micrometers to several centimeters) in one construction.

● Good leveling performance, overall film formation, dense and seamless coating.

● Using manual scraping or roller coating construction, professional, convenient, and controllable.

● Free from solvents, heavy metals, and environmentally friendly.

● 100% solid, free of volatile organic compounds (VOCs), environmentally friendly.

● The coating is continuous, dense, seamless, aesthetically pleasing and practical.

● Has excellent anti-corrosion performance, effectively protecting the substrate from corrosion.

Applications

● Waterproofing protection for roofs, swimming pools, water parks, etc;

● Production workshop anti-corrosion flooring and warehouse floor anti-corrosion and wear-resistant protection;

● Silent floors in schools, hospitals, kindergartens, and dust-free workshop floors;

● Can board sports venues such as basketball courts.

Specifications:

Item Number YP683/YP685
NCO% 9.2±0.2(YP685)
Appearance Grey color
Ratio A:B=1:1
Mix temperature 40℃
Work time(min) 8-12
Surface dry time(h) 12
Hardness(Shore A) 80±2
Tensile strength(MPa) 8
Elongation at break(%) 500
Right angle tear strength (KN/m) 60
Tear strength of pants (KN/m) 12
Rebound(%) 45
Akron wear(cm3) 0.15

● can be selected according to thickness requirements)After 24 hours of curing, the next process can proceed. If the construction interval exceeds 48 hours, a layer of interface agent needs to be applied before construction can proceed.

● After curing, if encountering adverse weather such as rain, a layer of interface agent must be applied before proceeding to the next process.

● Under normal circumstances, the coating film should be cured for at least 7 days after completion of painting to ensure optimal performance of the paint film.

Construction Conditions

● Base surface requirements: The concrete base surface should be cleaned, repaired flat, and polished to a certain roughness. Ensure that the concrete curing is completed, the strength reaches C25 or above, and the moisture content is less than 8%. After processing the base surface, the next process should be carried out as soon as possible.

● Environmental temperature and humidity requirements: The environmental temperature at the construction site should be above 5 ℃, and construction can only be carried out when the relative humidity is less than 85%.

● Ventilation conditions: Ventilation should be maintained during construction.

 Operation Methods and Requirements

● A: B=1:1 (mass ratio), solivent is not allowed to be added. Before use, pour component B into a mixing bucket and add the same mass of component A by electronic weighing in proportion. Stir thoroughly for 2-3 minutes to prevent damage Uneven mixing at the bottom of the bucket resulted in local non solidification of the floor. Ready to use and prepare, the prepared polyurea coating should be used up within 15 minutes.

● During construction, first layer apply solvent-free epoxy anti-corrosion sealing primer. After the primer is completely cured, polish the area to ensure interlayer adhesion reason (note: polishing floating dust must be cleaned with a vacuum cleaner). After cleaning and polishing the floating dust, use solvent-free polyurea intermediate coating combination material to mix evenly in proportion.

Afterwards, pour this combination material onto the floor and scrape it evenly with a trowel (3mm or 5mm trowel

 Suggested Use Qty.

1.2kg/mm/㎡, waterproof national standard thickness 1.5mm, single square usage 1.8kg, anti-corrosion national standard thickness 2.0mm, usage 2.4kg.

Online Inquiry

If you have any suggestions, please contact us!

Contact Us